The company appointed by the
Department in the construction
site project supervision. LBAC
project supervision by the Department,
to drainage, electrical, ventilation
and air conditioning and budget
supervision, and other professional
engineers. Senior Engineer for
the project director, a director
of accountability, the implementation
of projects of the "three
charged, two pipes,
one
coordination." Construction
phase supervision procedures
and content :
1, the project supervision of
the Director of the Department
in the project under the guidance
of the preparation of this project,
"Management Planning"
and the professional "Management
implementation details"
as the guiding document guiding
the project monitoring.
2, organizational design and
technical drawings Jiaodi doing.
3, organization and supervision
works Jiaode Jiaodi will meet
owners who will coordinate the
parties.
4, the implementation of project
monitoring, "the three
control". (quality, progress,
investment). Working procedures
and requirements under the supervision
of "the three control".
Of quality control : strict
vetting main raw materials,
components and equipment comply
with the design requirements
and the requirements for technical
standards, reinforce key points
adjacent to the strict supervision
and construction inspection
processes visa formalities prior
attention control : control
of the progress : strengthening
coordination tracking, periodic
(weekly) will be held on-site
coordination : the investment
control : strictly quantitative
assessment and on-site engineering
works of visas strict vetting
works clearing. For the companies
to develop a set of standardized
tables used monthly to the owners
submitted "Management Report",
the daily supervision by professional
engineers in the "supervision
log."
5, contract management : helping
owners drafting contracts, the
contract came up to collect
the relevant information, in
the fulfilment of the contract
management tracking, coordination
of disputes, to assist owners
to prevent claims incidents.
6, and information management
: the use of computers to collect,
collate, storage, transmission,
the use of information for owners
with complete project supervision.
7, organizational coordination
: coordination of the relationship
between the main building and
organizing periodic on-site
meetings to address the impact
trades progress, quality, cost
and other contradictions.
8, organizations in the early
completion of the inspection,
as archiving completed drawings
for the collation of information
and supervision information
to the owners filed.
9, the project quality assessment,
the evaluation report prepared.
10, to be completed acceptance
procedures.
|